| Clean Boiler Waterside Heat Transfer Surfaces |
|
|
|
| Written by USDOE Office of Industrial Technologies | ||||||||||||||||||||||||||||||
| Thursday, 01 July 2010 15:06 | ||||||||||||||||||||||||||||||
Clean Boiler Waterside Heat Transfer SurfacesEven on small boilers, the prevention of scale formation can produce substantial energy savings. Scale deposits occur when calcium, magnesium, and silica, commonly found in most water supplies, react to form a continuous layer of material on the waterside of the boiler heat exchange tubes. Scale creates a problem because it typically possesses a thermal conductivity an order of magnitude less than the corresponding value for bare steel. Even thin layers of scale serve as an effective insulator and retard heat transfer. The result is overheating of boiler tube metal, tube failures, and loss of energy efficiency. Fuel waste due to boiler scale may be 2% for water-tube boilers and up to 5% in fire-tube boilers. Energy losses as a function of scale thickness and composition are given in the table below.
Note: “Normal” scale is usually encountered in low-pressure applications. The high iron and iron plus silica scale composition results from high-pressure service conditions. *Extracted from National Institute of Standards and Technology, Handbook 115, Supplement 1. On well-designed natural gas-fired systems, an excess air level of 10% is attainable. An often stated rule of thumb is that boiler efficiency can be increased by 1% for each 15% reduction in excess air or 40°F reduction in the stack gas temperature. Example Annual Operating Cost Increase = 450,000 MMBtu/yr x $8.00/MMBtu x 0.02
= $72,000
Monitor Flue Gas Temperature Perform Visual Inspections Adapted from an Energy TIPS fact sheet that was originally published by the Industrial Energy Extension Service of Georgia Tech. FOR ADDITIONAL INFORMATION, PLEASE CONTACT:
EERE Information Center 1-877-EERE-INF (1-877-337-3463)
Industrial Technologies Program Energy Efficiency and Renewable Energy
U.S. Department of Energy
Washington, DC 20585-0121
|
||||||||||||||||||||||||||||||
| Preventive Maintenance Strategies for Compressed Air System 09/06/2010 | USDOE Office of Industrial Technologies Preventive Maintenance Strategies for Compressed Air System
|
Margins for Profit, Not Error: Corporate Energy Management at DuPont 30/06/2010 | Alliance to Save Energy Margins for Profit, Not Error: | Other Articles | ||
Latest Discussions
Re: Equipment for new plant
marketing1 1.4.2011 11:40
Equipment for new plant
pberko 31.3.2011 18:45
Re: The Catalyst - Archived Issues?
admin 28.6.2010 19:10